What to do with the uneven ground left behind
After a tree is removed, you are left with a stump, exposed roots, and often a depression or mound where the tree stood. Leveling that ground means filling the hole, breaking up compacted soil, and grading the surface so water drains properly and the area matches the rest of your yard. The method depends on how deep the depression is, what you want to do with the space afterward, and whether you are doing the work yourself or hiring it out.
The fastest approach is to hire a grading contractor with a small excavator or skid-steer loader. They can fill, compact, and grade in a few hours. If you are working by hand or with a shovel and wheelbarrow, expect a day or more for a large stump hole, and the result depends on how much care you take with compaction.
Key Takeaways
- Remove the stump and as many roots as you can reach before filling, because buried wood rots and creates sinkholes years later.
- Fill the hole in layers of 4 to 6 inches, compacting each layer with a hand tamper or plate compactor so the ground does not settle unevenly.
- Use soil that matches your yard — topsoil for planting areas, fill dirt for under grass, or a mix of both depending on your plan.
- Grade the filled area so water runs away from structures and toward existing drainage, sloping at least 1 inch per 4 feet.
- Let the ground settle for a few weeks before planting or building, because fresh fill compacts further under its own weight.
Remove the stump and roots first
Leaving the stump in the ground and burying it under fill is the most common mistake. Wood decays over years, creating voids beneath the surface. When those voids collapse, the ground above sinks, leaving a depression that collects water and becomes a tripping hazard. If you plan to build a shed, patio, or driveway over the spot, settling can crack the foundation.
The stump should be ground out or dug out completely. Stump grinding removes the visible stump and the upper root system down to about 12 inches below grade. If you are digging by hand, go as deep as you can reach — at least 18 to 24 inches — and pull out the main roots radiating from the center. Leave small roots in the soil; they will rot harmlessly and improve soil structure as they break down.
Once the stump is gone, the hole will be deeper than it was before. That is normal. You now have a clean cavity to fill.
Choose the right fill material
The soil you use matters. Topsoil is dark, rich, and holds nutrients — use it for areas where you plan to plant grass, shrubs, or a garden. Fill dirt is subsoil, usually tan or gray, compacts well, and costs less. It is fine under grass or as a base layer, but plants struggle in it alone. Compost or aged bark improves drainage and adds organic matter, but it settles more than mineral soil and is expensive for large holes.
For most yards, a mix works best: fill the bottom two-thirds with fill dirt, then top with 4 to 6 inches of topsoil. This gives you a stable base and a growing medium for grass or plants. If the hole is small (under 2 feet deep), topsoil alone is fine.
Do not use clay-heavy soil, construction debris, or wood chips as primary fill. Clay compacts into a hard, water-resistant layer. Debris rots and shifts. Wood chips break down and settle unevenly.
Fill and compact in layers
Dumping a truckload of soil into the hole and calling it done will fail. Uncompacted fill settles under its own weight, rain, and foot traffic, leaving a depression within weeks. Proper filling takes time but prevents that problem.
Spread soil in layers 4 to 6 inches thick. After each layer, compact it with a hand tamper (a flat metal plate on a long handle, swung down repeatedly) or a plate compactor (a motorized vibrating plate you walk behind). Hand tamping works for small holes; a plate compactor, which you can rent for $40 to $80 per day, is faster for large ones. Compact until the soil feels firm and does not compress further when you step on it.
Continue layering and compacting until the hole is slightly overfilled — the soil should mound a few inches above grade. This accounts for settling that will happen over the next few weeks. Once the ground has settled, you can add a final thin layer of topsoil and rake it level.
Grade for drainage
After the hole is filled and compacted, the surface should slope away from any structures — your house, garage, shed, or patio. Water that pools around a foundation can cause cracks and basement leaks. The standard slope is 1 inch of drop for every 4 feet of horizontal distance. You do not need a surveyor's level; a straightforward 4-foot level with a shim under one end will show you the slope.
Use a rake or shovel to shape the filled area. If the tree was near your house, slope the ground away from it. If it was in the middle of the yard, slope toward existing drainage or the lowest point of your property. Avoid creating a flat spot or a depression where water collects.
If the original yard already had a slope, match it. If the tree was in a low spot that naturally collects water, you may need to dig a shallow swale (a shallow ditch) to direct water elsewhere, or add a drain line if the area stays wet.
Timing for planting or construction
Fresh fill settles for weeks or months, depending on how well you compacted it and how much rain falls. If you plant grass seed or sod when ready, the ground may shift beneath it, creating bare spots or dead patches. If you build a patio or shed right away, the structure can crack or settle unevenly.
Wait at least 3 to 4 weeks before planting or building. During that time, water the filled area lightly a few times to help the soil settle and bond. After settling, add a final layer of topsoil if needed, rake it smooth, and then plant or build.
For heavy structures like a concrete pad or deck, waiting 6 to 8 weeks is safer. If the area is in a climate with freeze-thaw cycles, wait until after the first winter, because freezing and thawing cause additional settling.
Hiring a contractor versus doing it yourself
A grading contractor with an excavator can fill and grade a large hole in a few hours, usually for $300 to $800 depending on the hole size and how far away the fill material has to come from. They bring their own soil, compact it with machinery, and leave the area ready for planting or construction. This is the fastest and most reliable route if the hole is deep or wide.
Doing it yourself costs less in labor but takes more time and physical effort. You will need to source fill material — a landscape supply yard can deliver it for $30 to $60 per cubic yard, plus delivery. A 4-foot-deep, 3-foot-wide hole holds about 2 to 3 cubic yards. You will also need to rent a plate compactor if the hole is large, adding $40 to $80 to the cost.
If you have a small hole, a strong back, and time, hand-filling is doable. For anything larger than 3 feet deep or 4 feet across, hiring a contractor is worth the money.
Frequently Asked Questions
How deep is the hole usually after stump removal?
Stump grinding leaves a depression 12 to 18 inches deep and about as wide as the tree's crown was. Digging out the stump by hand can go deeper if you pull roots. The exact depth depends on how large the tree was and how much of the root system you remove.
Can I use the soil from the hole to fill it back in?
Yes, if the soil is not clay-heavy or contaminated. Reusing it saves money and disposal costs. Mix it with some fresh topsoil if it looks poor or compacted. Avoid using soil that came from deep in the ground — subsoil is often too dense and does not support plants well.
What if the ground keeps settling after I fill it?
Continued settling means the fill was not compacted enough or the hole was deeper than you thought and had buried roots still rotting underneath. Add more soil, compact it firmly, and wait another few weeks. If settling continues after that, you may have missed a large root or the stump itself — dig down and remove it.
Do I need to add fertilizer to the filled area?
If you used topsoil, no — it already has nutrients. If you used fill dirt, mix in compost or aged bark before planting, or spread a thin layer of compost on top after the ground settles. This improves drainage and gives grass or plants something to grow in.
How much does fill material cost?
Fill dirt runs $15 to $40 per cubic yard depending on your region and whether it is delivered. Topsoil costs $25 to $60 per cubic yard. A 4-foot-deep, 3-foot-wide hole needs about 2 to 3 cubic yards, so budget $50 to $180 for material alone, plus delivery fees if the supplier charges them.